01. Hospitals
Hospitals
Main campus renovations, sterile cores, and critical care units delivered around live operations.
Selvaggi Built renovates active healthcare environments where patient care, staff workflow, safety, and infection control cannot pause. From phasing and containment to shutdown coordination and closeout, we build around operations so care can continue.
Describe it in one line: scope, schedule, constraints. Our scoping assistant turns it into a formal brief for our estimators.
Prefer to talk it through first? Contact us. We respond within one business day.
01. Hospitals
Hospital renovations, sterile core upgrades, patient care areas, and critical infrastructure improvements delivered around active operations, staff workflow, and infection control.
View capability
02. Behavioral
Behavioral health renovations designed for safer care environments, with durable details, clear sightlines, controlled access, and patient-centered functionality.
View capability
03. Surgery
Surgery center and procedure room renovations delivered with careful phasing, containment, cleanliness, equipment coordination, and schedule discipline.
View capability
Active-facility renovation
Occupied healthcare renovations require more than a construction schedule. We coordinate phasing, containment, infection control, utility shutdowns, access, after-hours work, inspections, and daily documentation around active hospital operations so patient care can continue.
See How We WorkThat is the core of what we do. Our Zero-Disruption Protocol engineers the build sequence around facility operations: phasing, containment, infection control, shutdowns, access, and daily documentation, so patient care continues while construction moves forward.
Start an RFP at the top of this page (one line is enough to begin) or contact us directly. We respond within one business day, and we walk the facility before we quote.
California only: hospitals, medical office buildings, surgery centers, behavioral health facilities, imaging suites, and laboratories, under CSLB License #1079406. More detail in the full FAQ.
We listen on site before we quote. Send your project for review and we respond within one business day.
Occupied healthcare renovation requires more than skilled construction. It requires planning around patient care, staff workflow, infection control, safety, access, utilities, inspections, and daily operations.
Selvaggi Built works inside hospitals, medical office buildings, surgery centers, behavioral health facilities, imaging suites, laboratories, and other clinical environments where disruption must be controlled and communication must be clear. Our process is designed to protect operations while moving the work forward with precision.
We walk the facility before we quote, listening to the teams who know the space best. Every plan starts with a clear understanding of patient care, staff workflow, access, safety, infection control, and operational constraints.
The schedule serves the facility, not the build. We plan phasing, shutdowns, access, containment, deliveries, and work hours around active healthcare operations so construction moves forward with minimal disruption.
Healthcare renovations depend on details that cannot be left to chance. We coordinate utility tie-ins, vendor access, equipment requirements, containment, inspections, logistics, and communication so field work stays aligned with facility needs.
Cleanliness, safety, infection control, and separation from active care areas are central to how we work. We plan and maintain construction zones with the discipline required for occupied healthcare settings.
We track daily progress, field conditions, safety controls, infection prevention measures, inspections, and closeout requirements so every stakeholder stays aligned from kickoff to turnover.
Turnover is more than completion. We close out with the documentation, coordination, responsiveness, and craftsmanship required to help healthcare teams move into the finished space with confidence.
Send us your scope, schedule, and compliance tier. We respond within one business day.
Proven methodologies designed exclusively for complex healthcare interior environments.
01. Hospitals
Main campus renovations, sterile cores, and critical care units delivered around live operations.
02. Medical Offices
Tenant improvements for physician groups and specialty clinics, scheduled around patient appointments and clinical workflows.
03. Behavioral
Anti-ligature environments engineered for patient safety, staff sightlines, and regulatory compliance.
04. Imaging
Lead-lined suites, structural supports, and clean power for advanced imaging modalities, installed without disrupting adjacent clinical areas.
05. Surgery
Outpatient operating rooms and sterile processing spaces built to inpatient standards. ASC and HOPD ready.
06. Laboratory
Casework, utilities, and ventilation systems renovated in active lab environments, coordinated around specimen processing schedules and biosafety requirements.
Active-facility renovation
A hospital is a living system. It cannot pause for construction. Our Zero-Disruption Protocol engineers the build sequence entirely around facility operations. Before tools are mobilized, we conduct ground-penetrating radar scans, map critical utilities, and establish isolation zones. ICRA Level 4 barriers, rigid wall systems, and HEPA-filtered negative air machines prevent cross-contamination. Every phase is reviewed and approved by facility directors and Inspectors of Record. Disruptive tie-ins are restricted to designated after-hours windows. We do not adapt our methods to the hospital. Our methods are built strictly for it.
Identify utility conflicts, assess infection control requirements, and lock phasing logistics before mobilization.
Rigid containment walls and continuous HEPA negative-air filtration installed before any work begins.
All disruptive tie-ins, shutdowns, and utility work scheduled during pre-approved after-hours windows with facility sign-off.
Continuous superintendent monitoring verifies containment holds.
Our free planning tools generate an ICRA containment matrix, an HCAI compliance roadmap, and a structured project brief in minutes: the same first questions we answer on every site walk.
Open the ToolkitFree planning tools for healthcare facility teams: assess your ICRA containment level, map your HCAI compliance path, and turn rough notes into a structured project brief. No login. No obligation.
Select your construction activity type, patient risk group, project duration, and adjacent occupancy, then instantly generate your required ICRA barrier tier, negative-pressure specification, and mitigation checklist to share with your infection control team.
Disclaimer: Reference output only, based on current ICRA guidance. Final ICRA permits require authorization from facility Infection Prevention personnel prior to mobilization.
Enter your project scope and California facility type, then generate a baseline phasing schedule, critical-path summary, and HCAI compliance roadmap ready for your facility planning team.
Disclaimer: Baseline estimation only. Not a contractual schedule. Subject to site conditions, facility sign-off, and Inspector of Record review.
Proceed to formal RFPHave rough notes from a planning meeting? Start with one line and our scoping assistant structures it into a formal brief (scope, phasing constraints, compliance flags) ready to submit directly to our estimating team.
Active-facility healthcare interior renovations delivered across California.
What we do, what we know, and what we keep learning about building inside California's healthcare environments, written for the facility directors, planners, and infection preventionists who live it.
"Hospitals do not stop for us. We build around them. That is the entire job."
Aaron Selvaggi leads Selvaggi Built with a clear focus on healthcare renovation, occupied facility construction, and complex tenant improvement work across Southern California. His leadership emphasizes trust, responsiveness, safety, craftsmanship, and the disciplined coordination required to deliver successful projects in active hospital and medical environments.
Aaron Selvaggi. Founder & President.
Oversees project delivery, field coordination, operational systems, and team execution across Selvaggi Built's healthcare renovation work.
With a practical, solutions-focused leadership style, he supports clients, project teams, and trade partners by helping ensure complex renovations are planned clearly, coordinated effectively, and executed with the reliability active healthcare environments require.
Supports daily operations, team coordination, and administrative systems that help keep projects, communication, and internal workflows running smoothly.
With a steady, organized approach, he helps maintain the structure behind Selvaggi Built's work, supporting the office, project teams, and client-facing operations with reliability and attention to detail.
Leads brand strategy, marketing, and communication for Selvaggi Built, helping shape how the company presents its expertise, values, and healthcare renovation experience across every client touchpoint.
With a strategic eye for messaging, growth, and client experience, she develops the proposals, website content, marketing systems, and brand initiatives that support Selvaggi Built's continued visibility and trusted reputation.
Leads field execution with a focus on safety, coordination, quality, and minimizing disruption in active healthcare environments.
With a steady, hands-on approach, he works closely with project teams, trade partners, and facility staff to keep work moving efficiently, maintain clean and organized job sites, and support the level of communication and reliability complex renovations require.
Supports the estimating process through organized documentation, bid coordination, and clear communication with project teams, trade partners, and vendors.
With a detail-focused and dependable approach, she helps keep preconstruction workflows moving efficiently, supporting accurate proposals, timely responses, and the coordination needed to help projects start with clarity and confidence.
Keeps daily field work moving through hands-on coordination, jobsite organization, and consistent communication with project teams, trade partners, and facility staff.
With a practical, detail-focused approach, he helps maintain safe, clean, and efficient jobsites while keeping work aligned with project goals, schedule requirements, and the standards active healthcare environments demand.
Contributes to the estimating process through quantity takeoffs, bid support, document review, and coordination with internal teams and trade partners.
With a detail-oriented and eager approach, he helps organize preconstruction information, support proposal accuracy, and keep estimating workflows moving with clarity and responsiveness.
#1079406
Healthcare interior construction.
ICRA Level 3 and 4 execution under Title 22.
Send us your scope, schedule, and compliance tier. We respond within one business day.
We use the details you provide only to respond to your inquiry. We never sell or share your information.
What facility directors, planners, and infection preventionists ask us most: before, during, and after a project.
Start an RFP from any page: describe your project in a line or two and our scoping assistant structures it into a formal brief for our estimating team. If you would rather talk first, contact us directly; we respond within one business day.
Either way, we walk the facility before we quote. Every plan starts with a clear understanding of patient care, staff workflow, access, safety, and infection control on your site.
California only. We are based in Anaheim and build across Southern California's healthcare facilities under CSLB License #1079406.
Hospitals, medical office buildings, surgery centers, behavioral health facilities, imaging and diagnostic suites, and clinical laboratories. See Expertise for how we approach each sector.
Both. Recent work ranges from focused refurbishments (a nurses station, behavioral health dining rooms) to multi-phase renovation programs. What matters is not the size of the project; it is that the work happens inside an active healthcare environment, and that is what our process is built for.
It scales with scope and containment tier. A focused refurbishment can run in weeks; a multi-phase program can run well over a year, like the 27-room behavioral health renovation we completed at Canyon Ridge over 15 months. During scoping we build the phasing schedule around your facility's operations, so the real answer for your project comes out of the site walk, not a generic estimate.
Yes. We routinely coordinate construction sequencing directly with a facility's architect, engineer of record, or Inspector of Record. If your project does not yet have a design team in place, tell us during scoping so we can flag what it will need before construction starts.
That is the core of what we do. Our Zero-Disruption Protocol engineers the build sequence around facility operations: phasing, containment, infection control, utility shutdowns, access, and daily documentation, so patient care continues while construction moves forward. Read more in How We Work.
Containment is planned before tools are mobilized: ICRA barriers, rigid wall systems, HEPA-filtered negative air machines, sealed debris routes, and continuous superintendent monitoring to verify containment holds. Every phase is reviewed with facility directors and Inspectors of Record.
Disruptive tie-ins, shutdowns, and utility work are restricted to pre-approved after-hours windows with facility sign-off. The schedule serves the facility, not the build: work hours, deliveries, and access are planned around your operations.
We regularly execute ICRA Level 3 and Level 4 containment. Not sure what your project requires? Our free ICRA Level Assessor generates the barrier tier, negative-pressure specification, and mitigation checklist to share with your infection control team.
Yes. We plan and deliver work in HCAI-regulated facilities, coordinating phasing, inspections, and documentation with your Inspector of Record. Our compliance roadmap tool maps the permit path for your project type.
Your brief goes straight to our estimating team and we respond within one business day. From there we schedule a facility walk. We listen on site before we quote, so the proposal reflects your real operational constraints, not assumptions.
Yes. Selvaggi Built holds CSLB License #1079406 and builds exclusively in California. The licensing, insurance, and bonding documentation your jurisdiction requires, whether HCAI or a local building department, is provided as part of every bid package.
If your question is about a specific project, the fastest path is a conversation. We respond within one business day.